PROJECT NAME | : | Saadiyat Island Project-Museum District Infrastructure, CD-1001-125 C01 Design & Build Service Tunnel |
LOCATION | : | Abu Dhabi |
TYPE OF WORK | : | Design & Built Tunnel |
TOTAL LENGTH OF TUNNEL | : | 1.5km |
PROJECT DURATION | : | 2012 - 2013 |
CLIENT | : | Tourism Development & Investment Corporation (TDIC) |
ENGINEER | : | Parsons |
DESCRIPTION |
||
Design and Build Open Cut Security Service Tunnel for Louvre Museum and surrounding facilities. |