PROJECT NAME | : | Shams Abu Dhabi, Closed Canal Construction Works |
LOCATION | : | Abu Dhabi |
TYPE OF WORK | : | Marine Works |
LENGTH OF MARINE WORKS | : | Canal lengths – Central Park : 206 lm & Marina : 301 lm |
PROJECT DURATION | : | 2016 - 2017 |
CLIENT | : | Aldar Properties PJSC |
CONSULTANT | : | Hyder Consulting |
DESCRIPTION |
||
Construction of Closed Seawater Canal segments at the Central Park area joining the two constructed segments to the north and south canals between bridges 3 and 6 along with the necessary earthworks and seawater intake structure and pump station including Seawalls. |